Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

call 3/22/16 notes



Quick notes from the call.

Start:  3/22/2016 8AM PDT
End:    3/22/2016 9:10AM PDT

Present:
    Jouni Korhonen
    Gareth Edwards
    Richard Maiden
    Kevin Bross
    Xhafer Krasniqi
    Perminder Tumber
    Ofir Mahazri
    Richard Tse
    John Messenger
    Yasser Bawja
    Mohammed Akhter

Actual agenda:
    * RoE link setup (Gareth)
    * Spec draft D0.5 review (Richard)

Discussion:
 * Action points from last meeting:
   - AP1 Done: Kevin to produce the tunneling mapper text
   - AP2 Done: Gareth to sketch link setup procedure proposal
   - AP3 Done: Richard M. to produce D0.5 for the next call
 * Gareth went through the presentation on RoE link setup.
   PPT in http://www.ieee1904.org/3/email/msg00422.html
 * RoE nodes do not have roles per se. Jouni proposed that a
   role could be a local setting/variable that never goes on
   wire and can be configured e.g., during deployment time.
 * Synchronizing RoE nodes (endpoints) still open. We need a
   state machine for that purpose and clear guidelines how
   and when endpoints know they are in operational mode. One
   example is after parameter negotiation to start dummy data
   flows that eventually allow end points to move to operational
   move after encoutering a well defined event (e.g., after
   seeing certain seqnum etc).
 * Explicit termination of flows probably needed to release
   flowIDs etc.
 * Discussion to continue on the reflector.
 * Richard went through the D0.5. The draft was not uploaded
   yet by the time of presentation.
 * Kevin's tunneling mapper text available but not incorporated
   yet. Same for Sriram's text. Jouni to provide multiple
   text snippets.
 * The control packet common header format was replaced by a
   timing packet, which needs to be reverted.
 * New update to follow shortly. Discussion on numbering.
   Consult Glen (WG chair).
 * Jouni showed quickly Kevin's tunneling mapper text proposal.
   No discussion since we ran out of time.
 * New action points:
   - AP1: Jouni to provide the control process text
   - AP2: Jouni to provide experimental packet type text
   - AP3: Jouni to provide the pattern match text
   - AP4: Gareth to lead and continue the RoE link setup
          discussion.
   - AP5: Richard to provide D0.5x update with text inputs
          from Kevin and Sriram, and also correcting the
          misplaced control packet picture. If jouni manages
          AP1-3 in time they can also be included.

Next Call:
 * 4/5/2016 _10AM_ PDT. Note the exceptional time!

--
Jouni Korhonen, Broadcom Ltd.
O: +1-408-922-8135
M: +1-408-391-7160